• Skip to main content
  • Skip to primary sidebar

VEPP Inc.

Vermont Renewable Energy Programs

RFP Information

  • Standard Offer
  • Ryegate
  • News
  • About Us
  • Data Portal

ISO-NE Information and Forms

There are certain areas in Vermont that may require VELCO transmission studies to ensure no adverse impact on the Regional Transmission System in accordance with Section 1.3.9 of the ISO-NE Tariff.  Please review the following resources for more information:

  • ISO-NE DG Cluster Studies
  • ISO-NE Presentation October 2019
  • ISO-NE Memo 2019
  • ISO-NE Website

If your Standard Offer Plant is over 1 MW, it is imperative that you return your Planning Procedure 5-1 (PP5-1) form as soon as practicable.  If your interconnecting utility is Green Mountain Power (GMP), you should submit your PP5-1 directly to GMP.  If your interconnecting utility is not GMP, you should return your PP5-1 to VEPP Inc. at meghan@veppi.org.

Planning Procedure 5-1 form: PP5 FORM for 1MW+

Primary Sidebar

  • PROGRAM OVERVIEW
    • Contract Sample
    • Contract Financeability
    • Plants Built
    • Plants in Program
    • Monthly Production
      • 2026 Monthly Production
      • 2025 Monthly Production
      • 2024 Monthly Production
      • 2023 Monthly Production
    • Utility Pro Rata Share
    • Renewable Energy Credits
    • Certificate of Public Good
    • Transmission
    • T & D Screening
    • Utility & Interconnection Contacts
    • ISO-NE Information and Forms
  • 2022 RFP INFORMATION
  • Technologies
    • Farm Methane
    • Solar PV
    • Food Waste
    • Hydro
    • Existing Hydro
    • Wind
    • Biomass
    • Landfill Gas
  • Public Utility Commission
    • Public Utility Commission Rules
    • ePUC Information
    • Contact

Copyright © VEPP Inc. | PO Box 1938 | Manchester Center, VT 05255 | Email VEPP Inc.

DISCLAIMER: IF ANY OF THE INFORMATION ON THIS WEBSITE CONFLICTS WITH ANY PUBLIC UTILITY COMMISSION ORDER OR VERMONT STATUTE, THE PUBLIC UTILITY COMMISSION ORDER AND/OR VERMONT STATUTE SHALL CONTROL. | SITE BY EARTHLOGIC.

Copyright © 2026 · Infinity Pro on Genesis Framework · WordPress · Log in

MENU
  • Standard Offer
  • Ryegate
  • News
  • About Us
  • Data Portal