Program Snapshot

Plants Inside Program Cap Quantity Capacity (MW)
Plants Online 72 101.418
Plants Pending 12 16.765
Total 84 118.183
Plants Outside Program Cap Quantity Capacity (MW)
Plants Online 7.75 2.909
Plants Pending 1 2.200

Updated 3/14/25

Standard Offer

Established in 2009 pursuant to 30 V.S.A. § 8005a, the standard-offer program promoted the rapid deployment of small renewable generation.

Under the program, Vermont distribution utilities are required to buy renewable power from an eligible generator at a specified price for a specified period of time.  Program costs are distributed among Vermont utilities based on their pro rata share of electric sales.  The program is administered by VEPP Inc., the statewide purchasing agent (“Standard Offer Facilitator”) appointed by the Vermont Public Utility Commission.

Eligible plants can be no larger than 2.2 MW in size and include the following technologies: solar; wind with a capacity of 100 kW or smaller (“small wind”); wind with a capacity greater than 100 kW up to 2.2 MW (“large wind”); farm methane; landfill methane; food waste anaerobic digestion; biomass; and hydroelectric.

The standard-offer program was created with a 50 MW initial program capacity that was expanded to 127.5 MW in 2012.  The available program capacity was incrementally awarded to new plants until the 127.5 MW program capacity was reached.  The 2022 RFP was the last annual increase contemplated in the statute.  Thus, the 2022 RFP included all the unused 127.5 MW cumulative plant capacity identified at the issuance of the RFP.  A specific portion of each year’s capacity was reserved for plants proposed by Vermont utilities and was referred to as the Provider Block, with the remainder referred to as the Developer Block.  Farm methane plants remain outside the program capacity cap (i.e., no restrictions on the number of plants that can participate in the program). 2022 was the final RFP solicitation year contemplated in the statute.

Contact us at info@veppi.org for further information.

Primary Sidebar

  • PROGRAM OVERVIEW
    • Contract Sample
    • Contract Financeability
    • Plants Built
    • Plants in Program
    • Monthly Production
      • 2025 Monthly Production
      • 2024 Monthly Production
      • 2023 Monthly Production
      • 2022 Monthly Production
      • 2021 Monthly Production
      • 2020 Monthly Production
      • 2019 Monthly Production
      • 2018 Monthly Production
      • 2017 Monthly Production
      • 2016 Monthly Production
      • 2015 Monthly Production
      • 2014 Monthly Production
      • 2013 Monthly Production
      • 2012 Monthly Production
      • 2011 Monthly Production
      • 2010 Monthly Production
    • Utility Pro Rata Share
    • Renewable Energy Credits
    • Certificate of Public Good
    • Transmission
    • T & D Screening
    • Utility & Interconnection Contacts
    • ISO-NE Information and Forms
  • 2022 RFP INFORMATION
  • Technologies
    • Farm Methane
    • Solar PV
    • Food Waste
    • Hydro
    • Existing Hydro
    • Wind
    • Biomass
    • Landfill Gas
  • Public Utility Commission
    • PUC Orders
      • 2024 PUC Orders
      • 2023 PUC Orders
      • 2022 PUC Orders
      • 2021 PUC Orders
      • 2020 PUC Orders
      • 2019 PUC Orders
    • Public Utility Commission Rules
    • ePUC Information
    • Contact

Copyright © VEPP Inc. | PO Box 1938 | Manchester Center, VT 05255 | Email VEPP Inc.

DISCLAIMER: IF ANY OF THE INFORMATION ON THIS WEBSITE CONFLICTS WITH ANY PUBLIC UTILITY COMMISSION ORDER OR VERMONT STATUTE, THE PUBLIC UTILITY COMMISSION ORDER AND/OR VERMONT STATUTE SHALL CONTROL. | SITE BY EARTHLOGIC.

Copyright © 2025 · Infinity Pro on Genesis Framework · WordPress · Log in

MENU
  • Standard Offer
  • Ryegate
  • News
  • About Us
  • Data Portal