12/21/2018 – Proposal for Decision for investigation to review the 2019 RFP avoided costs. Comments filing deadline is 1/9/2019.
-
9/10/2018 – Transcript of 9/10/18 workshop to review the avoided costs for the 2019 Standard Offer Program RFP
-
8/2/2018 – Order to review the avoided costs for the 2019 Standard Offer Program RFP
UTILITY INTERCONNECTION
Developers are encouraged to contact their interconnecting utility to discuss interconnection requirements prior to submitting bids.
Green Mountain Power provides a detailed solar map showing the DG circuit capacity per substation nameplate rating.
TRANSMISSION WHEELING
Producer may be responsible for arranging for any transmission services required under the terms of the Interconnecting Utility’s duly approved transmission tariff, if any.
PLANT MAP EXAMPLE
Plant map(s) included with the proposal must be 24” x 36”, high resolution, and encompass the following:
-
clearly identify the property for which the proponent has site control
-
clearly labeled: (1) property line boundaries, (2) location of plant site on property, (3) any required rights-of-way, (4) total acreage of plant site, (5) anticipated interconnection point, (6) location of any existing plants or other proposed plants that would share common equipment and infrastructure with the proposed plant (such as roads, control facilities, and connections to the electric grid), and (7) the relationship of the site to other local infrastructure, including power lines, roadways, and water sources.
-
a detailed site layout plan illustrating the location of all major equipment and facilities such as panel arrays, inverters, transformers, and any required structures on the plant site.
View Plant Map Example – (for best results, please download the map using the down arrow in the upper right hand corner of the screen)